Dhaka Wasa looks to more groundwater extraction
Skip to main content
  • Home
  • Economy
  • Stocks
  • Analysis
  • World+Biz
  • Sports
  • Features
  • Epaper
  • More
    • Subscribe
    • COVID-19
    • Bangladesh
    • Splash
    • Videos
    • Games
    • Long Read
    • Infograph
    • Interviews
    • Offbeat
    • Thoughts
    • Podcast
    • Quiz
    • Tech
    • Archive
    • Trial By Trivia
    • Magazine
    • Supplement
  • বাংলা
The Business Standard

Wednesday
July 06, 2022

Sign In
Subscribe
  • Home
  • Economy
  • Stocks
  • Analysis
  • World+Biz
  • Sports
  • Features
  • Epaper
  • More
    • Subscribe
    • COVID-19
    • Bangladesh
    • Splash
    • Videos
    • Games
    • Long Read
    • Infograph
    • Interviews
    • Offbeat
    • Thoughts
    • Podcast
    • Quiz
    • Tech
    • Archive
    • Trial By Trivia
    • Magazine
    • Supplement
  • বাংলা
WEDNESDAY, JULY 06, 2022
Dhaka Wasa looks to more groundwater extraction

Bangladesh

Jahidul Islam
02 March, 2020, 09:55 pm
Last modified: 02 March, 2020, 10:15 pm

Related News

  • Covid is not transmitted thru’ Wasa-treated water: Study
  • Dhaka Wasa fires 2 officials for talking about employee association’s corruption in media
  • Wasa water foul-smelling yet germ-free, MD claims
  • 'Extraction 2' wraps filming
  • Are we preserving groundwater for the future?

Dhaka Wasa looks to more groundwater extraction

A new project is likely to get Ecnec nod on Tuesday

Jahidul Islam
02 March, 2020, 09:55 pm
Last modified: 02 March, 2020, 10:15 pm
Dhaka Wasa looks to more groundwater extraction

Around 80 percent of daily water supply to city residents comes from groundwater, causing the water level to deplete by three metres a year on average, claims Dhaka Wasa.

The daily demand for water is around 240 crore litres in the capital.  Around 20 percent of the demand is met with surface water from five treatment plants.

In a move to check groundwater depletion, three projects have been going on at a cost of more than Tk14,000 crore to treat river water and its supply to the capital.

But Dhaka Wasa still has not been able to overcome its dependence on groundwater as seen by its plan to install 95 more deep tube-wells and replace 285 others to extract 44.7 crore of water more every day.

In this connection, the Local Government Division has sent a project proposal titled "Emergency Water Supply" involving an estimated cost of Tk732 crore to the Planning Commission for approval.

Dhaka Wasa wants to complete the project work by 2023 with funds from the government exchequer.

The project is expected to be presented at the meeting of the Executive Committee of the National Economic Council (Ecnec) for approval on Tuesday.

The demand for water is increasing by 5 percent every year owing to the growth of population in the capital while the water extraction capacity of pumps is on the decline.

If this trend continues, the daily water demand in Dhaka will increase to about 350 crore litres by 2023.

Environmentalists opine if more groundwater were extracted, it would have a negative impact on the environment.

They think the proposed project is a disastrous one and neither is it farsighted, considering the demand for water in the future.

 "The groundwater extraction should be brought down to zero as it is assumed that more than 70 percent of the country's population will live in towns by 2041. The main destination of these people will be Dhaka," said AKM Saiful Islam, a professor at the Institute of Water and Flood Management at Buet.

The groundwater level has been depleting fast owing to excessive extraction, he said, adding that the water level could not be refilled with rainwater during the rainy season as the number of nearby waterbodies is decreasing day by day, creating an adverse impact on nature. 

Against this backdrop, he urged the authorities concerned to expedite the ongoing projects for the treatment of river water rather than approving a new project for extracting more groundwater.

Quoting recent research, ecologist Muhammad Azaz said 13 towns across four countries – Bangladesh, India, Nepal, and Pakistan – in the Hindu Kush Himalayan region are facing increased water insecurity in the wake of inadequate urban planning coupled with a rapidly changing climate.

The water level in many towns in Bangladesh has been declining drastically although there are enormous reserves of surface water, he said, adding that a project for extracting groundwater through deep tube-wells will never be sustainable.

A regeneration of 190 tube-wells and rehabilitation of 95 others will also be undertaken through the project. Besides, 250 pump houses will be built.

The Local Government Division said Dhaka Wasa started supplying water from the Padma (Jashaldia) Water Treatment plant recently in order to reduce pressure on groundwater. Work on two other plants is in progress. The massive demand for water can be met with surface water if all the projects can be completed by 2024.

Earlier, Dhaka Wasa implemented an interim water supply project at a cost of Tk612 crore to supply 90 crore litres daily as the ongoing river water supply projects did not get expected pace.

Top News

Dhaka Wasa / groundwater / Extraction

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • Area-wise load shedding schedule will be announced: PM
    Area-wise load shedding schedule will be announced: PM
  • China-led trade bloc holds promise, with some caveats
    China-led trade bloc holds promise, with some caveats
  • State Minister for Power, Energy and Mineral Resources Nasrul Hamid. Photo: Collected
    Load shedding, power crisis will not last long: State minister

MOST VIEWED

  • Build Dhaka East-West Elevated Expressway, relocate kitchen markets: PM
    Build Dhaka East-West Elevated Expressway, relocate kitchen markets: PM
  • Lee Hyun-seung (third from right), head of Korea Expressway Corp.'s Overseas Project Division, shakes hands with Quazi Muhammad Ferdous, head of the Bridge Authority of Bangladesh, after signing a contract on June 29 (local time).
    Korean company to oversee N8 Expressway in Bangladesh
  • Padma Bridge from satellite. Photo: Screengrab
    Padma Bridge from satellite 
  • Photo: Collected
    Road accident kills student near Shikkha Bhaban
  • Govt to start inspecting Dhaka shopping malls before Eid
    Govt to start inspecting Dhaka shopping malls before Eid
  • Hundreds of motorcycles, cars, buses and other vehicles were in a queue at the toll plaza of the Padma Bridge on Sunday as the bridge drew a massive number of visitors on the first day after its inauguration. PHOTO: MUMIT M
    Padma Bridge: First day sees over Tk2cr toll collection

Related News

  • Covid is not transmitted thru’ Wasa-treated water: Study
  • Dhaka Wasa fires 2 officials for talking about employee association’s corruption in media
  • Wasa water foul-smelling yet germ-free, MD claims
  • 'Extraction 2' wraps filming
  • Are we preserving groundwater for the future?

Features

The sea beach in Kuakata. Photo: Syed Mehedy Hasan

Five places in Southern Bangladesh you could visit via Padma Bridge

2h | Explorer
Genex Infosys Limited is the country's largest call centre with more than 2,000 seats and full-set equipment. Photo: Courtesy

How domestic demand made Genex Infosys a BPO industry leader

3h | Panorama
The OPEC+ group of 23 oil-exporting countries met virtually on Thursday. Photo: Bloomberg

OPEC+ did its job, but don’t expect it to disappear

1d | Panorama
Mirza Abdul Kader Sardar with AK Fazlul Haque, Chief Minister of Bengal, at Haque's reception at the Lion Cinema, Dhaka, 1941. Photo: Collected

Panchayats: Where tradition clings to survival

1d | Panorama

More Videos from TBS

Photo: TBS

Cristiano Ronaldo looking for a new challenge

1h | Videos
Tufan, Sultan catch attention of the buyers

Tufan, Sultan catch attention of the buyers

1h | Videos
Sheikh Kamal Business Incubator to be inaugurated at CUET Wednesday

Sheikh Kamal Business Incubator to be inaugurated at CUET Wednesday

16h | Videos
Tejgaon becoming uninhabitable for illegal rickshaw garages, truck stands

Tejgaon becoming uninhabitable for illegal rickshaw garages, truck stands

16h | Videos

Most Read

1
Photo: Collected
Africa

Uganda discovers gold deposits worth 12 trillion USD

2
TBS Illustration
Education

Universities may launch online classes again after Eid

3
Meet the man behind 'Azke amar mon balo nei'
Splash

Meet the man behind 'Azke amar mon balo nei'

4
Build Dhaka East-West Elevated Expressway, relocate kitchen markets: PM
Bangladesh

Build Dhaka East-West Elevated Expressway, relocate kitchen markets: PM

5
File Photo: BSS
Energy

India pulls out of LoC funding for part of Rooppur power transmission work

6
Illustration: TBS
Interviews

‘No Bangladeshi company has the business model for exporting agricultural product’

EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Privacy Policy
  • Comment Policy
Copyright © 2022
The Business Standard All rights reserved
Technical Partner: RSI Lab
BENEATH THE SURFACE
A customer checks a knife at a blacksmith’s shop at the capital’s Karwan Bazar. Knives and other Qurbani tools are in huge demand as the country prepares to celebrate Eid-Ul-Azha. Photo: Rajib Dhar

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net